A mountain of waste is disappearing, future stars are shining !
The first phase of the project has begun.
Early March, our members cleaned the site.
End September, foundations are ongoing.
About ten workers are working on the site, supervised by a site manager who was a former football player of Kibera Black Stars.
Some of other jobs have been benefited of the site as our cooks.
Between September and October, the walls of the ground floor are raising-up, then 3 classroom are put in place.
Early December, the first floor is already finished. Since January, the roof is raising-up.
The roof was placed in early February:
At the end of Ferbruary, doors and windows were fixed.
Mid-march = building of a front wall made with plastic bottles The stairs are fixed.
May 2021 = Glass windows and inner doors are fixed and ceilings and lights are connected
Kibra for Kibra !
You can see the latest finishing, furnishing and equipping in the pdf document: